1.
Proposed Position : Hydrologist/Hydro geologist/Grondwater
Modeler
2.
Name of
Expert : Nadeem
Tariq
3.
Date of
Birth : May 13, 1985 Citizenship:
Pakistani
4.
Cell No : 0322-4564838
5.
Education
M.Sc. (Applied Hydrology) Punjab
University Lahore , 2008
6.
Other
Training
·
5 Days Training Course on Groundwater Modeling using Modflow Pro in
Irrigation & Power Department, Govt. of Punjab, Lahore. (2012)
·
Workshop on Urban Water Demand Management in Jamshoro University,
Jamshoro, Sindh, Pakistan. (AUG 2008)
·
ICID & PANCID’S International workshop Organized by WAPDA on
Agriculture, Irrigation, and Ground & Surface Water Resources of the World
in Aiwan-e-Iqbal Lahore , Pakistan . (OCT
2008)
·
Workshop on Geotech & Engineering Geology Problematic Soil, Slope
Stability & Insitu Tests in Institute of Geology, Punjab University Lahore,
Pakistan. (APRIL 2009)
·
Workshop on Mathematical Modeling in Lahore
University of Management Sciences
(LUMS), Lahore , Pakistan . (JULY 2009).
·
Research Project
Groundwater
Flow Modeling of Lahore
City Aquifer by using
MODFLOW.
Main Objectives of the Project:
Ø
Study the Hydrology of Lahore city aquifer to clearly understand the various
sources of Recharge and discharge.
Ø
Calibration of the “USGS three dimensional finite difference groundwater
flow model”
Ø
(MODFLOW) against the observed historic groundwater levels to have an
understanding of the behavior of the aquifer of Lahore city
Ø
Prediction of water table position in aquifer in future due to estimated
withdrawal of groundwater, continuously increasing with time
Miscellaneous
Tasks Performed During Job & Studies
Ø
Data & Maps Collection from different Organizations like WASA,
I&P, NESPAK,WAPDA,GSP and PMD for different Assignments and Research
Project.
Ø
Soil-Water-Crop Relationship Studies by using CropWat 8.0 Computer
Model.
Ø
Water Resources (Groundwater) Management Studies by using MODFLOW.
Ø
Hydro Economic Analysis Studies.
Ø
Hydrologic Modeling (Groundwater & Surface Water) studies by using
different Hydrological Computer Models.
Ø
Consult the libraries of WASA, WAPDA, CEWRE, NESPAK, I & P and GSP
for Assignments and Literature Review for the Research Project.
Ø
Digitization of Maps in ARC VIEW.
Computer Skills
Microsoft Word Microsoft Excel Microsoft Power Point
C Language CCNP
Hydrological Computer Models
(i) Surface Water
DFW (Design Flood for Windows) DRW (Design Reservoir for Windows)
SAMADA HEC-HMS
HYDRO
CAD HEC-RAS
SWMM
(ii) Ground Water
GMS (8.1) MODFLOW VISUAL MODFLOW
MT3D GW VISTA
(iii) GIS
ARC VIEW 10 SURFER 10
7. Countries of Work Experience: Pakistan
8. Languages
Language
|
Writing
|
|
Speaking
|
English
|
Excellent
|
Excellent
|
Very Good
|
Urdu
|
Excellent
|
Excellent
|
Excellent
|
Punjabi
|
Very Good
|
Very Good
|
Excellent
|
9. Employment Record:
Feb. 2009 To Aug 2010
Employer
Position Held
|
TECHNO
CONSULTS INT. KARACHI
JUNIOR HYDROLOGIST
|
NOV 2010 To SEP 2011
Employer
Position
Held
OCT 2011 TO DATE
Employer
Position Held
|
YAZDAN ENGINEERING SERVICES, LAHORE
JUNIOR HYDROLOGIST
JV of LAHMEYER Int. GmbH and NDC , PAKISTAN
Assistant Groundwater Modeler
|
10 .Detailed Tasks Assigned
|
11.Work Undertaken That Best Illustrates To Capability To Handle The
Task Assigned
|
I. Review all documents
relevant to the Project including those prepared by the PPTA Consultants;
II.
Identify, procure and develop a three dimensional finite difference
type groundwater model of the aquifer system underlying the LBDC command;
III.
Liaise with both the hydro-geologists and the on-farm water management
officers and adequately incorporate conjunctive use aspects in the model;
IV.
Prepare LBDC specific documentation of the model and its use; and
V.
Provide both formal and on-the-job training relating to groundwater
modeling to PMU/PIU/PIPD Staff.
|
Name of the Project: LBDC Improvement Project
Pakistan.
Year: OCT 2011 TO-Date
Location: LBDC
Client: Irrigation
Department, Punjab.
Position Held: Assistant Groundwater Modeler
Activity Performed:
·
Collection & Analysis of Hydrological Records
·
Prepare Data for Model
·
Input data in GMS 8.1 (Modflow)
·
Groundwater Balance Study for LBDC
·
Seepage Analysis for LBDC
·
Making Contours maps for Derth to water table, EC status, SAR and RSC
etc.
·
Water Demand Management Studies
·
Preparation of final Report.
REPOSIBILITIES
·
Collection & Analysis of Hydrological Records.
·
Data entry and report writing.
·
Preparation of Final Report.
Name of the Project: SANBU Hydropower Project
Year: NOV 2010 to Sep 2011
Location: AJ&K
Client: WAPDA
Main Project Features: Hydropower Project
Position Held: Junior
Hydrologist
Activity Performed:
·
Collection & Analysis of Hydrological Records
·
Area Elevation Capacity Curve Analysis
·
Water Demand Management Studies by Reservoir Operation.
·
Flood Frequency Analysis
·
Flood Hydrograph Analysis
·
PMP Analysis for the Estimation of PMF
·
Preparation of Feasibility Report.
REPOSIBILITIES
·
Collection & Analysis of Hydrological Records.
·
Data entry and report writing.
Preparation of
Feasibility Report.
Name of the Project: Darmalak, Surgul & Naikband
Dam Project
Year: Feb 2009 TO AUG 2010
Location: KOHAT, KPK
Client: WAPDA
Main Project Features: Hydropower Project
Position Held: Junior
Hydrologist
Activity Performed:
·
Collection & Analysis of Hydrological Records
·
Area Elevation Capacity Curve Analysis
·
Water Demand Management Studies by Reservoir Operation.
·
Flood Frequency Analysis
·
Flood Hydrograph Analysis
·
PMP Analysis for the Estimation of PMF
·
Preparation of Feasibility Report.
REPOSIBILITIES
·
Collection & Analysis of Hydrological Records.
·
Data entry and report writing.
·
Preparation of Feasibility Report.
|
No comments:
Post a Comment