1.   
Proposed Position             :  Hydrologist/Hydro geologist/Grondwater
Modeler
2.   
Name of
Expert                  :  Nadeem
Tariq
3.   
Date of
Birth                       :  May 13, 1985      Citizenship:
Pakistani
4.   
Cell No                                :  0322-4564838
5.   
Education
                 M.Sc.  (Applied Hydrology) Punjab 
University  Lahore 
6.   
Other
Training
·              
5 Days Training Course on Groundwater Modeling using Modflow Pro in
Irrigation & Power Department, Govt. of Punjab, Lahore. (2012)
·              
Workshop on Urban Water Demand Management in Jamshoro University,
Jamshoro, Sindh, Pakistan. (AUG 2008)
·              
ICID & PANCID’S International workshop Organized by WAPDA on
Agriculture, Irrigation, and Ground & Surface Water Resources of the World
in Aiwan-e-Iqbal Lahore , Pakistan 
·              
Workshop on Geotech & Engineering Geology Problematic Soil, Slope
Stability & Insitu Tests in Institute of Geology, Punjab University Lahore,
Pakistan. (APRIL 2009)
·              
Workshop on Mathematical Modeling in Lahore 
University  of Management Sciences
(LUMS), Lahore , Pakistan 
·              
Research Project
                        Groundwater
Flow Modeling of Lahore 
 City 
                          Main Objectives of the Project:
Ø
Study the Hydrology of Lahore city aquifer to clearly understand the various
sources of Recharge and discharge.
Ø
Calibration of the “USGS three dimensional finite difference groundwater
flow model”
Ø
(MODFLOW) against the observed historic groundwater levels to have an
understanding of the behavior of the aquifer of Lahore 
Ø
Prediction of water table position in aquifer in future due to estimated
withdrawal of groundwater, continuously increasing with time
Miscellaneous
Tasks Performed During Job & Studies
Ø
Data & Maps Collection from different Organizations like WASA,
I&P, NESPAK,WAPDA,GSP and PMD for different Assignments and Research
Project.
Ø
Soil-Water-Crop Relationship Studies by using CropWat 8.0 Computer
Model.
Ø
Water Resources (Groundwater) Management Studies by using MODFLOW.
Ø
Hydro Economic Analysis Studies.
Ø
Hydrologic Modeling (Groundwater & Surface Water) studies by using
different Hydrological Computer Models.
Ø
Consult the libraries of WASA, WAPDA, CEWRE, NESPAK, I & P and GSP
for Assignments and Literature Review for the Research Project.
Ø
Digitization of Maps in ARC VIEW.
Computer Skills
       Microsoft Word                  Microsoft Excel                     Microsoft Power Point
       C Language                       CCNP
Hydrological Computer Models 
(i)            Surface Water
    DFW (Design Flood for Windows)                DRW (Design Reservoir for Windows)
 
SAMADA                                                      HEC-HMS
 
HYDRO
CAD                                               HEC-RAS
 
SWMM
(ii)           Ground Water
    GMS (8.1) MODFLOW                                VISUAL MODFLOW
    MT3D                                                            GW VISTA
(iii)          GIS
    ARC VIEW 10                                               SURFER 10
7. Countries of Work Experience:                          Pakistan 
8.    Languages
| 
Language | 
Writing |  | 
Speaking | 
| 
English | 
Excellent | 
Excellent | 
Very Good | 
| 
Urdu | 
Excellent | 
Excellent | 
Excellent | 
| 
Punjabi | 
Very Good | 
Very Good | 
Excellent | 
9.    Employment Record:
| 
       Feb. 2009 To Aug 2010 
       Employer 
       Position Held | 
TECHNO
  CONSULTS INT. KARACHI 
JUNIOR HYDROLOGIST | 
| 
       NOV 2010 To SEP 2011 
       Employer 
       Position
  Held 
OCT 2011 TO DATE 
       Employer 
       Position Held | 
YAZDAN ENGINEERING SERVICES, LAHORE 
JUNIOR HYDROLOGIST 
JV of LAHMEYER Int. GmbH and NDC , PAKISTAN 
Assistant Groundwater Modeler | 
| 
10  .Detailed Tasks Assigned | 
11.Work Undertaken That Best Illustrates To Capability To Handle The
  Task Assigned | 
| 
 
  I.    Review all documents
  relevant to the Project including those prepared by the PPTA Consultants; 
 II.   
  Identify, procure and develop a three dimensional finite difference
  type groundwater model of the aquifer system underlying the LBDC command; 
III.   
  Liaise with both the hydro-geologists and the on-farm water management
  officers and adequately incorporate conjunctive use aspects in the model; 
IV.   
  Prepare LBDC specific documentation of the model and its use; and 
 V.     
  Provide both formal and on-the-job training relating to groundwater
  modeling to PMU/PIU/PIPD Staff. | 
Name of the Project: LBDC Improvement                                 Project
  Pakistan. 
Year:                     OCT 2011 TO-Date 
Location:              LBDC 
Client:                   Irrigation
  Department, Punjab. 
Position Held:      Assistant Groundwater Modeler 
Activity Performed: 
·        
  Collection & Analysis of Hydrological Records 
·        
  Prepare Data for Model 
·        
  Input data in GMS 8.1 (Modflow) 
·        
  Groundwater Balance Study for LBDC 
·        
  Seepage Analysis for LBDC 
·        
  Making Contours maps for Derth to water table, EC status, SAR and RSC
  etc. 
·        
  Water Demand Management Studies 
·        
  Preparation of final Report. 
REPOSIBILITIES 
·        
  Collection & Analysis of Hydrological Records. 
·        
  Data entry and report writing. 
·        
  Preparation of Final Report. 
Name of the Project: SANBU Hydropower Project  
Year:                           NOV 2010 to Sep 2011 
Location:                    AJ&K  
Client:                         WAPDA 
Main Project Features: Hydropower Project 
Position Held:    Junior
  Hydrologist 
Activity Performed: 
·        
  Collection & Analysis of Hydrological Records 
·        
  Area Elevation Capacity Curve Analysis 
·        
  Water Demand Management Studies by Reservoir Operation. 
·        
  Flood Frequency Analysis 
·        
  Flood Hydrograph Analysis 
·        
  PMP Analysis for the Estimation of PMF 
·        
  Preparation of Feasibility Report. 
REPOSIBILITIES 
·        
  Collection & Analysis of Hydrological Records. 
·        
  Data entry and report writing. 
Preparation of
  Feasibility Report. 
Name of the Project: Darmalak, Surgul &                                   Naikband
  Dam Project 
Year:                         Feb 2009 TO AUG 2010 
Location:                  KOHAT, KPK 
Client:                       WAPDA 
Main Project Features: Hydropower Project 
Position Held:    Junior
  Hydrologist 
Activity Performed: 
·        
  Collection & Analysis of Hydrological Records 
·        
  Area Elevation Capacity Curve Analysis 
·        
  Water Demand Management Studies by Reservoir Operation. 
·        
  Flood Frequency Analysis 
·        
  Flood Hydrograph Analysis 
·        
  PMP Analysis for the Estimation of PMF 
·        
  Preparation of Feasibility Report. 
REPOSIBILITIES 
·        
  Collection & Analysis of Hydrological Records. 
·        
  Data entry and report writing. 
·        
  Preparation of Feasibility Report. | 
 
No comments:
Post a Comment